Completion Date2023
ClientKu-ring-gai Council
LocationWahroonga NSW
CategoryStreetscapes & Cycleways / Landscaping & Public Spaces / Complex Infrastructure
SCOPE OF WORKS
- Reconstruction of many reinforced commercial driveways.
- Construction of reinforced footpath and kerb ramps.
- Stormwater Upgrades include:
- Supply and installation subsoil drainage.
- Construction of soakage pits to connect to tree pits.
- Construction of heel proof trench drain.
- Installation of new galvanised RHS stormwater pipes beneath footpath pavement.
- Reconstruction of garden infill median island.
- Reconstruction of layback with reversed gutter fall.
- Reconstruction of paved footpath to shop fronts including reconstruction of a reinforced concrete subbase.
- Reconstruction of kerb and gutter to suit new carpark realignment.
- Construction of a decorative ‘off form’ coloured concrete seating wall.
- Construction of multiple garden beds including softscaping.
- Supply and installation of furniture and fixtures including:
- Bicycle hoops.
- Bollards.
- Bin Enclosures.
- Wheel Stops.
- Bench Seats.
- Plinth Seats.
- Construction of raked ‘Corten’ Steel Edging to multiple garden beds.
- Construction of Porous Paving pavement to garden bed surrounds.
- Re-sheeting of asphalt carpark pavement.
- Installation of Linemarking and signage.