Completion Date2022
ClientBlacktown City Council
LocationPlumpton NSW
CategoryComplex Infrastructure
SCOPE OF WORKS
- Excavation and carting of 4,350 tonnes of material for disposal.
- Installation of 1,600 tonnes of DGB20 with thorough compaction.
- Laying of 1,450 tonnes of Asphaltic Concrete across multiple courses.
- Applying 14/10 spray seal on pavement.
- Installation of 4,750m2 of geogrid.
- Installation of RCP’s between 375mm to 525mm and corresponding concrete/sandstone headwalls.
- Installation of lintels, grates, and pit construction/adjustments.
- Laying of subsoil piping.
- Reconstruction of kerb and gutter, dish crossing, and laybacks.
- Reconstruction of kerb ramps, footpath and driveways.
- Installation of topsoil and laying of turf.