Completion Date2020
ClientDASCO Group
LocationNorwest NSW
CategoryRemediation and Earthworks

SCOPE OF WORKS

  • Installed over 700m of concrete pipes, ranging from 375mm to 750mm in diameter.
  • Modified the creek to accommodate the new stormwater design.
  • Installed over 50 stormwater pits and OSD tanks.
  • Executed all concrete works, including the construction of kerb and gutter, and concrete footpaths.
  • Completed over 3800sqm of asphalt paving.
  • Earthworks for all civil and associated aspects.
  • Construction of a block retaining wall.