SCOPE OF WORKS

  • Removal of existing trees.
  • Excavation and removal of embankment material.
  • Installation of 21 lin.m of sandstone boulders to embankment varying from 300mm – 600mm.
  • Spraying of dry mix concrete on embankment.
  • Coordination with APA regarding dangerous gas lines.
  • Installation of high strength Geocomposite geogrid.
  • Installation of temporary cofferdam for water mitigation.
  • Construction of concrete footpath pavement.
  • Clearing of debris using Hydro Vacuum.
  • Landscape works including tree planting and turfing.