SCOPE OF WORKS
- Removal of existing trees.
- Excavation and removal of embankment material.
- Installation of 21 lin.m of sandstone boulders to embankment varying from 300mm – 600mm.
- Spraying of dry mix concrete on embankment.
- Coordination with APA regarding dangerous gas lines.
- Installation of high strength Geocomposite geogrid.
- Installation of temporary cofferdam for water mitigation.
- Construction of concrete footpath pavement.
- Clearing of debris using Hydro Vacuum.
- Landscape works including tree planting and turfing.