Convil Group

Completion Date2023
ClientNorthern Beaches Council
LocationVarious in Northern Beaches LGA, NSW
CategoryComplex Infrastructure / Remediation & Earthworks

SCOPE OF WORKS

Embankment stabilisation at 2 x locations 836 Barrenjoey Road, Palm Beach and 78 Bungan Head Road, Newport. Scope of works included:

    • Clearing all failed material from batter including vegetation and dispose to authorized facility. Coordination with the Arborist tree assessment for necessary improvements.
    • Installation of drainage pipe.
    • Trimming embankment to a suitable slope as per requirements.
    • Installation of structural fill to the site.
    • Construction of a concrete dish drain.
    • Installation of turf reinforcement mat, coir mesh, turf and planting shrubs to stabilise the embankment.